TecSAR-1
Re-entered 3 Jul 2024TecSAR-1 (NORAD 32476, COSPAR 2008-002A) was a IL satellite that re-entered Earth's atmosphere on 3 Jul 2024, launched on 21 Jan 2008 on the TecSAR-1 mission. It was operated by DDRD / U9900 as part of the Ofeq programme. The spacecraft was built by IAI on the TecSar bus, with a mass of 300 kg. Like most satellites in low orbits, it was gradually slowed by atmospheric drag until re-entry. Historical record from Orbital Radar's satellite archive, cross-referenced with the live satellite catalogue.
Lifecycle
Specifications
Frequently asked questions
What happened to TecSAR-1?
TecSAR-1 re-entered Earth's atmosphere on 3 Jul 2024, ending a mission that began with its launch in 2008. Objects in low orbits are gradually slowed by atmospheric drag until they fall back and burn up on re-entry.
When did TecSAR-1 re-enter the atmosphere?
TecSAR-1 re-entered on 3 Jul 2024, according to Orbital Radar's historical catalogue records.
How long was TecSAR-1 operational?
TecSAR-1 was operational for roughly 6 years, from 1 Oct 2015 to 1 Mar 2022.
Who operated and built TecSAR-1?
TecSAR-1 was operated by DDRD / U9900 and built by IAI (IL).