CERTIFICATE OF RE-ENTRYOrbital Register™ · by Orbital Radar™
Orbital Register seal
Entry no.
2019-0012

PROGRESS MS-09

PROGRESS MS-09 (NORAD 43537) was deorbited in a controlled re-entry after a space station visit on 25 January 2019, after 6 months in orbit.

Controlled re-entryOfficial date
NORAD number
43537
International designator
2018-058A
Object type
Spacecraft
Country
Russia
Launched
Re-entered (UTC)
25 Jan 2019UTC calendar day
Time in orbit
6 months200 days
How it ended
Deorbited (controlled re-entry) after a station visit
Latitude range
—
Mass
4,863 kg
Operator
RKKE
Built by
TsSKB-Progress
Bus
7K-TGM
Programme
Progress MS

Where it came down

Not on record

No position was recorded for this re-entry. Its final orbit is not on record.

Life in orbit

6 months

PROGRESS MS-09’s lowest and highest points above Earth, week by week, from its tracking history.

Also ended on 25 Jan 2019

1 entry

From the same launch

2018-058
Orbital Register seal
Entered in the Orbital Register™, founding volume, September 2026.
Record version 1 · No corrections · orbitalradar.com/register/2019-0012
© 2026 Orbital Radar. Cite this entry by its number; the register itself may not be copied.