ORBITAL RADAR

AxEMU: Axiom's Moon Suit

The Axiom Extravehicular Mobility Unit is NASA's next spacesuit, built by Axiom Space with Prada on the foundations of NASA's xEMU. NASA's 2026 Artemis update moved the first Moon landing to Artemis IV, planned for 2028, and Axiom is contracted to supply the suits for that crew, with a first test in space planned for 2027.

Last updated: · Published: · Space Library
Artemis IV
First Landing (Planned)
Axiom Space
Manufacturer
Prada
Design Partner
Oakley
Visor Partner
$228.5M
Artemis Order

Overview

The Axiom Extravehicular Mobility Unit (AxEMU) is being built for NASA's return to the lunar surface and for spacewalks in low Earth orbit. In February 2026 NASA restructured Artemis: Artemis III became an Earth-orbit test flight in 2027, including tests of the new spacewalk suits, and the first crewed landing moved to Artemis IV, planned for 2028 near the lunar south pole, where permanently shadowed craters fall below −230°C (−382°F).

The suit evolves NASA's in-house Exploration Extravehicular Mobility Unit (xEMU), which the agency worked on for more than a decade before deciding to buy spacewalk services instead. Under the Exploration Extravehicular Activity Services (xEVAS) contract, Axiom won its first Artemis task order in September 2022, worth $228.5 million, and a separate order in 2023 for a version to use on the ISS. Since Collins Aerospace left the programme in 2024, Axiom is the only company still building NASA's next spacewalk suits.

Prada designed the white outer layer and Oakley the visor system. The suit is meant to fit astronauts from the 1st to the 99th percentile of body size, to support spacewalks of at least eight hours and to survive at least two hours inside permanently shadowed craters. Axiom has not published an operating pressure.

Progress has been real but slower than planned. By February 2026 the suit had logged more than 850 hours of crewed pressurised testing, and Axiom expects to complete its critical design review in 2026. NASA's Inspector General reported in April 2026 that the lunar suit was over its mass limit at its 2024 preliminary design review and that demonstrations had slipped by at least a year and a half. Axiom is contracted to deliver qualification suits, a flight suit for an ISS demonstration and two flight suits for the Artemis IV crew.

Key Specifications

Full Name Axiom Extravehicular Mobility Unit (AxEMU)
Manufacturer Axiom Space (Houston, TX)
Design Partners Prada (outer layer), Oakley (visor system)
Heritage Evolved from NASA xEMU (Exploration Extravehicular Mobility Unit)
Primary Missions Artemis IV lunar surface spacewalks (planned 2028); ISS spacewalks
Contracts xEVAS task orders: $228.5M for Artemis (2022) plus an ISS order (2023)
Pressure Not published
Spacewalk Length At least 8 hours
Thermal Endurance At least 2 hours in permanently shadowed craters (below −230°C)
Mobility Joints designed for kneeling, bending and reaching, a big step on from the Apollo A7L
Crew Fit 1st to 99th percentile body sizes
Status In development: critical design review due in 2026; first test in space planned for 2027

Development Timeline

2022
NASA picks Axiom Space and Collins Aerospace for its xEVAS spacewalk-suit contract (June). Axiom wins the first Artemis task order, worth $228.5 million (September).
2023
Axiom unveils an AxEMU prototype in March, wearing a dark cover layer that hid the final design. A second order covers a version for the ISS (July).
2024
Collins Aerospace leaves the programme (June). The preliminary design review flags that the lunar suit is over its mass limit (September). Axiom and Prada unveil the white flight design (October).
2025
Oakley is announced as the visor partner (July). Crewed testing continues.
2026
NASA restructures Artemis: Artemis III becomes a 2027 Earth-orbit test including the new suits, and the first landing moves to Artemis IV (February). Axiom raises $350 million (February), closing the round above $525 million (June). Critical design review under way.
2027
First test in space planned, on the ISS or on Artemis III.
2028
Artemis IV: the first crewed Moon landing planned with AxEMU suits.

Related Pages

Frequently Asked Questions

On Artemis IV, NASA's first crewed Moon landing since 1972, currently planned for 2028. NASA moved the landing from Artemis III in February 2026; Artemis III is now an Earth-orbit test flight in 2027 that includes tests of the new spacewalk suits. Axiom is contracted to deliver two flight suits for the Artemis IV crew.
Yes. Axiom holds a separate NASA order for an ISS version, and a flight suit for an ISS demonstration is on contract. NASA has said the first test in space is planned for 2027, on the ISS or on Artemis III. If it succeeds, the AxEMU could replace the ageing EMU before the station retires around 2030.
Axiom chose Prada for its expertise in high-performance fabrics and stitching. Prada designed the suit's white outer layer, which has to resist lunar dust, abrasion and extreme temperatures, so the work is engineering, not just styling. Oakley supplies the visor system.
Axiom's first Artemis task order, awarded in September 2022, is worth $228.5 million for the design, testing and certification of the suits and their support equipment. A second order covers an ISS version. NASA now buys spacewalks as a service, so there is no single price per suit; the overall xEVAS contract has a combined ceiling of $3.1 billion.
Axiom is a private company funded by investors and by NASA contracts. In February 2026 it raised $350 million in a round co-led by Type One Ventures and the Qatar Investment Authority, which closed above $525 million in June 2026. Its NASA work includes the AxEMU suits and private astronaut missions to the ISS.
It is designed to let astronauts kneel, bend and pick things up far more easily than the Apollo A7L, to fit a much wider range of body sizes, to support spacewalks of at least eight hours and to survive at least two hours in the extreme cold of permanently shadowed craters, which Apollo crews never entered.

Explore More

Cite this page

Pick a style, then copy it or download it for your reference manager.

Orbital Radar. (2026, October 14). AxEMU: Axiom's Moon Suit. Retrieved November 22, 2026, from https://orbitalradar.com/spacesuits/axemu

“AxEMU: Axiom's Moon Suit.” Orbital Radar, 14 Oct. 2026, orbitalradar.com/spacesuits/axemu. Accessed 22 Nov. 2026.

Orbital Radar (2026) AxEMU: Axiom's Moon Suit. Available at: https://orbitalradar.com/spacesuits/axemu (Accessed: 22 November 2026).

Orbital Radar. “AxEMU: Axiom's Moon Suit.” Last modified October 14, 2026. https://orbitalradar.com/spacesuits/axemu.

@misc{orbitalradar_spacesuits_axemu,
  author       = {{Orbital Radar}},
  title        = {AxEMU: Axiom's Moon Suit},
  year         = {2026},
  month        = oct,
  howpublished = {\url{https://orbitalradar.com/spacesuits/axemu}},
  url          = {https://orbitalradar.com/spacesuits/axemu},
  urldate      = {2026-11-22},
  note         = {Accessed 2026-11-22}
}
TY  - ELEC
AU  - Orbital Radar,
TI  - AxEMU: Axiom's Moon Suit
PY  - 2026
DA  - 2026/10/14
PB  - Orbital Radar
UR  - https://orbitalradar.com/spacesuits/axemu
Y2  - 2026/11/22
LA  - en
ER  - 
Download RISFor Zotero, EndNote and Mendeley

Live figures change, so keep the date you accessed the page. How to cite Orbital Radar